Community Corner

Mystic Drawbridge Closure Begins March 6

Businesses will remain open but the drawbridge will be closed to pedestrians and vehicles from 7 a.m. Wednesday, March 6 until 1 p.m. on Friday, March 8.

The 54-hour closure of the Mystic drawbridge will take place from March 6 to March 8.

According to a press release from the Connecticut Department of Transportation the bridge closure will take place from 7 a.m., Wednesday, March 6 until 1 p.m. on Friday, March 8. During that time, the bridge will be closed to vehicular and pedestrian traffic.

The closure was to allow the installation of a vehicle barrier gate system that will span Route 1 on the Stonington side of the bridge.

Find out what's happening in Grotonwith free, real-time updates from Patch.

Businesses in downtown Mystic will remain open during the closure.

After the bridge re-opens on March 8, 2013, marine traffic in the river will be continue to be restricted until April 15, 2013.

Find out what's happening in Grotonwith free, real-time updates from Patch.

Here is the detour information provided by the state DOT:

DETOUR INFO

Through traffic will be detoured from Route 1 to I-95 along Allyn Street (State Hwy 614) in Groton and Route 27 in Stonington. Local traffic and visitors to Mystic will be able to navigate and park along Route 1. Traffic signs and other devices will be used to warn motorists of the bridge closure and to guide motorists along the detour route.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here